INFRASTRUCTURE & SUPPORT
We always strive to do the best for you. We are all dedicated to serve you in every way.
Road Network
LiMA Technology Center provides 38 kilometers of superb concrete roads in varying widths for its primary (45m), secondary (25m) and tertiary (18m) roads.
This internal road network is complemented by an underground drainage system, appropriate street lighting and directional signages. The LTC’s road design utilizes roundabouts and cul de sacs allowing free flowing traffic all throughout the development.
Latest News
Posted 03-01-2017
AboitizLand breaks ground for The Outlets at Lipa, the country’s first authentic outlet shoppi... read more...
Posted 30-11-2016
Welcome ! BGen. Charito "Ching" B. Plaza PEZA - Director General Lima Technology ... read more...
Posted 29-02-2016
A new office was turned over to PEZA and BOC Last February 15, 2016. Ribbon Cutting was heade... read more...